Search
`
September 10, 2024

PJM Interconnection LLC (PJM)

PJM
PJM Operating Committee Briefs: Sept. 10, 2021
PJM stakeholders unanimously endorsed manual updates related to behind-the-meter generation business rules on status changes developed in special sessions.
AES
Storage the ‘Linchpin’ to 24/7 Carbon-free Power, Corporate Buyers Say
Reaching the goal of 24-7 carbon-free power will require a dramatic increase in storage to fill gaps in renewable output, large energy users say.
Paradise Energy Solutions
PJM, Stakeholders Respond to MOPR Replacement Challenges
PJM and its stakeholders continue to jostle over the impact of the proposed replacement for the expanded MOPR as responses continue to be filed at FERC.
PJM
PJM PC/TEAC Briefs: Aug. 31, 2021
PJM is recommending using an installed reserve margin of 14.6%, slightly up from 14.4% required in 2020.
Ɱ, CC BY-SA 4.0, via Wikimedia Commons
Ohio Senate Challenges PJM’s MOPR-Ex Filing
GOP legislators from Ohio, who have rolled back the state's renewable energy goals, asked FERC to reject a PJM rule change regarding subsidized generation.
PJM
PJM MRC Briefs: Aug. 25, 2021
PJM stakeholders endorsed manual revisions implementing fast-start pricing even after some members questioned one of the changes.
E65vern, CC BY-SA 4.0, via Wikimedia Commons
PJM Examining Chemical Shortage
PJM is investigating whether the shortage of trona, a mineral used in sequestering emissions from coal units, is impacting generation in the RTO.
© RTO Insider LLC
PJM Considering New Options for In-person Meetings
PJM may hold a test meeting as it works toward returning to fully in-person meetings for the first time since the start of the COVID-19 pandemic.
Shutterstock
Mixed Stakeholder Reception to PJM MOPR Replacement
More than two dozen comments poured in to FERC regarding PJM’s proposed replacement for the extended minimum offer price rule.
PJM
FERC Seeks Evidence in PJM TOs’ Bid to Rate-base Network Upgrades
FERC directed PJM’s transmission owners to provide evidence that they are being squeezed financially by their inability to earn a return on network upgrades.

Want more? Advanced Search