Long Island Power Authority (LIPA)
The NYPSC got updates on how utilities are responding to pleas to improve billing practices and customer outreach after recent electric and gas bill surges.
BOEM approved the construction and operations plan for the 132-MW South Fork Wind Project off Long Island.
The U.S. Department of the Interior approved the construction and operations plan for the 132-MW South Fork Wind Project being built for LIPA.
FERC will reconsider whether the 1% de minimis threshold and netting provisions of PJM's DFAX method result in fair transmission cost allocations.
Fishermen, environmentalists, labor unions and local residents broadly support the 132-MW South Fork Wind Project off Long Island.
The New York PSC ruled that projects located anywhere in the state may be eligible for state-sponsored EV prize competitions, granting a LIPA request.
The New York CAC met to discuss bioenergy emissions and the formation of a utility consultation group while also receiving updates from advisory groups.
Preliminary analysis suggests that a mesh-and-backbone network design would be best to integrate offshore wind into the New York grid.
LIPA could replace most of its fossil-fueled peaker plants with energy storage by 2030, saving ratepayers millions, according to a new study.
The New York PSC heard a progress report on a grid study to identify transmission upgrades and investments needed to meet clean energy goals.
Want more? Advanced Search