Search
`
November 16, 2024

Lawrence Berkeley National Laboratory (LBNL)

Encore Renewable Energy
Study: Solar Land-use Estimates Overstated for Low-carbon Future
A new Berkeley Lab study estimates that the land needed for utility-scale solar is dramatically lower than previously thought.
PNNL
Study Links Western Wildfires to Arctic Ice Melt
A PNNL study has solidified the link between melting Arctic Ocean ice and the wildfires that regularly ravage the Western U.S.
Berkeley Lab
Solar Surpasses Wind in MISO, SPP Queues
Solar has overtaken wind in the interconnection queues of MISO and SPP as declining PV costs make solar attractive even in wind belt states.
© RTO Insider LLC
New Bill Would Tackle Transmission Cost Allocation
The Efficient Grid Interconnection Act would require FERC to revise rules on cost allocation and push RTOs and ISOs to consider grid-enhancing technologies.

Want more? Advanced Search