Search
`
November 25, 2024

geomagnetic disturbances (GMD)

Questions and Answers on NERC’s Proposed GMD Rules
FERC has required NERC to determine the severity of a “benchmark” GMD event — the threshold against which covered entities would evaluate their system’s vulnerability and develop protective strategies.
PJM Operating Committee Briefs
A round-up of news from the PJM Operating Committee on April 7, 2015.
MISO Reliability Subcommittee Briefs
A summary of measures and issues discussed by the MISO Reliability Subcommittee on Jan. 27, 2015.
PJM Planning Committee Briefs
A round-up of news from the PJM Planning Committee on Nov. 4, 2014.
FERC OKs GMD, Training Standards; Proposes Modeling Rule Change
FERC approved NERC reliability rules on geomagnetic disturbances, personnel training and capacity modeling.
FERC OKs Rules on Geomagnetic Disturbances, Frequency Response
FERC gave preliminary approval last week to rules drafted by NERC to protect the electric grid from geomagnetic disturbances (GMDs) and a final OK to a reliability standard for frequency response.
Duke Energy
Federal Briefs
Briefs from federal agencies governing PJM Interconnection and other national organizations. This week's news include stories from Congress, the US Dept. of Energy, the EPA, FERC, NEI, and other national news.
FERC Orders Rules on Geomagnetic Disturbances
FERC Said that the electric transmission system needs more protections against geomagnetic disturbances like the 1989 solar storm that caused the collapse of the Hydro-Quebec grid.

Want more? Advanced Search