Search
`
July 25, 2024

Federal Energy Regulatory Commission (FERC)

© RTO Insider LLC
FERC OKs MISO Removal of Annual Reviews for Long-term Tx Projects
MISO is off the hook as far as having to conduct annual cost-benefit analyses for its major transmission projects, FERC has ruled.
CrossingLights, CC-BY 4.0, via Wikimedia
FERC Directs J.P. Morgan to Declare Affiliations of Two Holding Firms
FERC issued an order that J.P. Morgan Investment Management qualified as an affiliate of Mankato Companies and IIF US Holding 2, through which it is tied to other firms including El Paso Electric.
State of Massachusetts
ISO-NE Must Include Pumped Hydro in Inventoried Energy Program, FERC Rules

FERC sided with Brookfield Renewable in the company’s complaint against the RTO. The IEP is intended to compensate resources for storing extra fuel.

 
Farragutful, CC BY-SA 4.0, via Wikimedia Commons
FERC Approves PJM Cost Recovery for NERC Penalty
FERC agreed that PJM could recover a $140,000 penalty for violating NERC reliability standards from ratepayers.
FERC/NERC
Déjà Vu as FERC, NERC Issue Recommendations over Holiday Outages
FERC and NERC called for completing winterization standards and strengthening natural gas infrastructure in response to widespread outages last Christmas.  
BLM
NERC Reliability and Security Technical Committee Approves DER Research
The RTSC approved a whitepaper looking into the effects of distributed energy resources and their aggregations on the bulk power system.
© RTO Insider LLC
Hickenlooper and Peters Introduce BIG WIRES Act
The BIG WIRES Act would require FERC to set minimum transfer capabilities between regions to better connect the grid in order to promote reliability and ship cheap power around the country.
Moody's
Moody’s: Permitting Process Holding Transmission Back, Risking Reliability
A report from Moody's Investors Service asserted that, despite a need for transmission investment, regulatory bottlenecking is causing significant delay for utilities.
© RTO Insider LLC
More Federal Outreach Needed to Support Clean Energy Development on Tribal Land
The challenge of unlocking the renewable energy development of tribal lands goes beyond financing, and requires respect, patience and innovation.
Shutterstock
NERC Seeks Comment on IBR Registration Proposals
NERC is seeking comment on proposed changes to its Rules of Procedure intended to promote the registration of inverter-based resources.

Want more? Advanced Search