Search
`
November 25, 2024

Bonneville Power Administration (BPA)

DC Circuit Reverses FERC on BPA Refund Case
A panel for the D.C. Circuit reversed a decision by FERC that prevented a generating plant from recouping funds from the Bonneville Power Administration.
CAISO Considers Fast-Track Approval for 2 Tx Projects
CAISO is considering approval of two low-cost transmission upgrade projects using an accelerated procedure that bypasses the usual stakeholder process.
CAISO, BPA Ink Agreement to Ease Northwest EIM Transfers
CAISO has signed a transmission agreement with the Bonneville Power Administration designed to facilitate Energy Imbalance Market transfers.
FERC Accepts CAISO Contracts for Imported Frequency Response
FERC approved CAISO's agreements to procure frequency response from the Bonneville Power Administration and Seattle City Light.
Foes Narrow Differences at FERC Summit on EIM Bidding
Last week's FERC technical conference on the EIM began on a contentious note but concluded with participants understanding each others’ perspectives.
More Work Needed on Western RTO Proposal, Stakeholders Say
More changes are needed to the CAISO proposed rules for a Western RTO to win approval from the states in which PacifiCorp operates, stakeholders say.
EBA Speakers Ponder a Western RTO
Western energy execs discussed the growth of the EIM, a Western RTO, “Caliphopia” and how the Western Interconnection is likely to change.
Puget Sound Energy, Talen Agree to Close Colstrip Units
By Robert Mullin Puget Sound Energy (PSE) and Talen Energy reached an agreement with environmentalists to shut down Units 1 and 2 at the coal-fired Colstrip...
Report: Sabotage Threat Uncertainty Could Lead to Wasteful Spending
Uncertainty over the grid’s vulnerability to sabotage could lead to wasteful and excessive spending, a new congressional report warns.

Want more? Advanced Search