Search
`
November 22, 2024

battery energy storage systems (BESS)

Shutterstock
Battery Storage Developers Bump Against Perception of Risk
Residents worry about fire risk from proposed energy storage facility in Long Island.
Medway Grid LLC via Massachusetts Energy Facilities Siting Board (EFSB)
Mass. Energy Facilities Siting Board Punts on Energy Storage
The agency determined that it lacks jurisdiction over battery energy storage systems, referring such projects to the state's Department of Public Utilities.
Admin Monitor
Texas PUC Briefs: Sept. 15, 2022
Texas regulators are working with the industry to streamline the interconnection processes for all resources at both the transmission and distribution levels.
Hawaiian Electric
HECO Cancels Oahu Battery Storage Project
Hawaiian Electric withdrew plans to build a key battery storage system on Oahu; tight deadlines and supply chain issues appear to be the cause.
KIUC
Hawaii PUC Approves Kauai Pumped Storage Project
Hawaii's PUC approved construction of the West Kauai Energy Project, a pumped storage hydropower project designed to produce 110 GWh of annual output.
Energy Vault
DOE Targets 90% Cut in Cost of Long-duration Storage
A new initiative at DOE's national labs will use AI and machine learning to cut the time long-duration storage technologies will need to reach commercial scale.
NERC
NERC Tries to Stay Ahead of the Curve on Batteries, Hybrids
Interconnection queues across the country are bursting with requests from battery energy storage systems (BESS) and hybrid power plants pairing storage with solar or wind. Because of their growing numbers and the differences in their operating characteristics from traditional synchronous generation, NERC issued a reliability guideline in March on the resources’ performance capabilities and how …

Want more? Advanced Search