Search
`
August 26, 2024

American Electric Power (AEP)

PJM
AMP Presses AEP, PSEG on Transmission Projects
American Municipal Power (AMP) continued its criticism of PJM’s grid spending, grilling utility officials during a marathon TEAC meeting.
© RTO Insider
EUCI Panelists: Midwest Tx Plans Must Address Wind, Seams
Panelists at EUCI’s Transmission Expansion in the Midwest conference said industry must focus on exporting wind energy and overcoming seams processes.
Top 30 Posts 5% Q3 Income Gain, Fares Worse in Other Metrics
The Top 30 saw improved profits in Q3 over 2016, but revenues fell, and more than half of the companies saw their top and bottom lines shrink.
AEP Base ROE Complaints Ordered to Settlement
FERC said it didn’t have enough information to decide on complaints that AEP affiliates are earning an unjust return-on-equity for transmission projects.
© RTO Insider
Overheard at GTM US Power Renewables Summit
Greentech Media’s inaugural U.S. Power & Renewables Summit drew an international crowd of energy sector participants to hear from industry leaders.
Kansas Electric Power Cooperative
FERC Rejects SPP Change on Network Resource Upgrades
FERC issued rulings in three SPP transmission cases, mostly siding with the RTO but rejecting its proposed changes to classifying service upgrade costs.
AEP
AEP Falls Short of Q3 Expectations, Remains Optimistic
American Electric Power said the mildest weather conditions since 1992 led its third-quarter sales to fall 12.8% from a year ago, down to $4.1 billion.
Wikimedia/Electric cat
AEP Seeks $4.8M from MISO in Past Lost Revenues Complaint
AEP filed a complaint against MISO for failing to collect and distribute millions in transmission charges from defunct load-serving entities a decade ago.
AEP
Public Utility Commission of Texas Briefs: Aug. 31, 2017
The Texas PUC consented to a list of 36 issues to be contested related to SWEPCO’s costs associated with parent AEP’s massive Wind Catcher project.
1 of 8 MISO-PJM Proposals Pass Initial Test
Seven of the eight stakeholder-originated project proposals evaluated by MISO and PJM are not expected to pass the RTOs’ benefit threshold.

Want more? Advanced Search