Search
`
August 2, 2024

FERC Denies Rehearing on NY Buyer-Side Mitigation

By William Opalka

FERC on Thursday denied a merchant transmission owner’s request for rehearing of a 2013 order that denied its complaint that NYISO improperly implemented its buyer-side market power mitigation exemption test. However, the commission granted a limited clarification and directed NYISO to make an additional compliance filing (EL12-98).

nyisoHudson Transmission Partners filed the complaint against NYISO after the exemption test was employed for the developer’s 660-MW HVDC merchant transmission line between Ridgefield, N.J., and New York City, which went into service in 2013. The developer had argued that the NYISO Tariff defining “generator” did not apply to its “controllable line.”

“The commission addressed HTP’s argument in the November 2013 order and found that the NYISO Tariff’s references to generators are intended to include controllable lines,” FERC wrote, also citing commission precedent.

FERC also clarified whether a holder of unused unforced deliverability rights (UDRs) has the ability to retain or sell them. The NYISO Tariff permits a UDR holder to either use the rights to offer generation from outside the NYISO footprint into the NYISO installed capacity auctions, or to return its UDRs to NYISO for a given year.

“We agree with HTP that retention of such unused rights in this circumstance, i.e., when the offered ICAP does not clear, does not constitute market manipulation without additional showings under the commission’s anti-manipulation rule,” FERC wrote.

The order said that NYISO fulfilled its compliance requirements to provide the specific scaling factor used for the HTP Project. But it required an additional filing “reflecting Tariff provisions that provide the conceptual basis and general framework for a scaling factor and that are sufficiently broad and flexible to allow for the kinds of variations that exist with respect to UDR projects.”

FERC Rejects Environmentalists’ Rate Complaint vs. Duke

FERC rejected a North Carolina environmental group’s request to reconsider its decision not to investigate the group’s market manipulation allegations against Duke Energy (EL15-32).

The North Carolina Waste Awareness and Reduction Network (NC WARN) had complained that Duke was building excess power plants instead of purchasing power from neighboring utilities, resulting in unjust rates. It asked that the commission fund a study evaluating the benefits of Duke joining an RTO. In its request for rehearing, the group asserted the study would show that the creation of a southeastern RTO would result in savings for customers.

FERC denied NC WARN’s request for lacking certain filing requirements, including a “statement of issues.”

“This requirement is not a mere formality,” the commission said. “Rather, the purpose of this requirement is to ensure that the filer, the commission and all other participants understand the issues raised by the filer, and to enable the commission to respond to these issues and avoid wasteful litigation.”

— Michael Brooks

ERCOT, MISO, SPP All Record New Wind Peaks

ERCOT, MISO and SPP all set new generation records for wind in the last two weeks.

SPP has seen the most increased activity, setting six new generation peaks this season. The latest came Nov. 15, when SPP eclipsed 9,000 MW of generation for the first time with 9,013 MW. The RTO generated a record 38.3% of its electricity from wind energy Nov. 4.

windMISO set its latest record peak with 12,613.9 MW on Nov. 19, breaking the previous mark of 12,006 set Oct. 28. Todd Ramey, the RTO’s vice president of system operations and market services, told an informational forum last week that wind generated 4.1 TWh in October, up from 2.9 TWh in September and 3.6 TWh in October 2014.

ERCOT reported a new high of 12,641 MW of wind at 9:36 p.m. Nov. 16 — representing more than 75% of its installed wind capacity — and accounting for almost one-third of its electricity production.

ERCOT’s previous high came Oct. 22, when it generated 12,238 MW, meeting 36.8% of its load at the time.

The RTOs are home to many of the top wind-producing states, with the Dakotas, Iowa, Kansas, Minnesota, Nebraska, Oklahoma and Texas all generating between 6.9% (Nebraska) and 28.5% (Iowa) of their energy from wind in 2014, according to the American Wind Energy Association.

Tom Kleckner and Amanda Durish Cook

Company Briefs

OncorNextEra Energy has offered to buy Energy Future Holdings’ Oncor transmissions business, which is slated to be sold to an investment group led by Hunt Consolidated. NextEra made the offer in a filing with the U.S. Bankruptcy Court in Delaware, which is reviewing EFH’s Chapter 11 exit plan.

The sale of Oncor is at the heart of EFH’s $42 billion reorganization strategy, but the company has chosen the Hunt-led group as the buyer.

“NextEra’s alternative transaction is the only proposal that can provide several significant benefits to Oncor, its customers, its creditors and EFH,” NextEra wrote in its bankruptcy court filing.

More: Wall Street Journal; Reuters

Duke Completes Storage System on Site of Retired Coal Plant

Beckjord (Source: Duke)Duke Energy, working with two other companies, has installed a 2-MW battery storage system on the grounds of its retired W.C Beckjord coal-fired plant near New Richmond, Ohio. Duke said the Beckjord site allowed the company to take advantage of existing transmission infrastructure that connected the battery system to the grid.

The battery storage system will be used in grid frequency regulation — to either release energy onto the grid instantaneously or absorb excess energy — without the grid operator having to dispatch a generator. The battery system is faster and cheaper than a power plant, which could take 10 minutes or more to ramp up.

Duke worked with LG Chem, which provided the lithium-ion batteries, and Greensmith, which provided the software necessary for the frequency synchronicity. It is Duke’s third battery storage system.

More: Duke Energy; Charlotte Business Journal

Susquehanna Unit 1 Back Online After Nov. 12 SCRAM

Talen Energy’s Susquehanna Unit 1 in Pennsylvania came back online Thursday night after being off for a week following an unscheduled automatic shutdown.

Talen reported that during routine testing of equipment on Nov. 12, one of eight large valves controlling steam from the reactor to the generator closed. The unit automatically shut itself down.

The company said it conducted other maintenance tasks while the unit was down. “We made the choice, while the unit was out of service during a period of mild fall weather and lower wholesale power prices, to advance some maintenance tasks we had planned for the refueling outage next spring,” said Jon Franke, Susquehanna site vice president.

More: Talen Energy

Retired Talen Coal Plant Site Has Potential Buyers

CoretteSourcePPLTalen Energy is in talks with potential buyers of a site in Billings, Mont., where the defunct J.E. Corette coal-fired power plant is being dismantled.

The 153-MW plant, which operated for 47 years, was closed in April because it didn’t meet mercury pollution standards.

Talen, which acquired the site during its spinoff this year from PPL, did not identify the prospective buyers.

More: The Billings Gazette

NRG Names Frotte Treasurer as Stock Continues to Plummet

Frotte
Frotte

NRG Energy announced a small management shakeup Nov. 19 as its stock value closed below $12/share for the first time in 11 years.

NRG named Gaetan Frotte as senior vice president and treasurer. Frotte, who served as the senior vice president of finance and strategy of NRG Yield, replaces G. Gary Garcia, who left the treasurer position for undisclosed reasons at the end of June. Chad Plotkin, vice president of investor relations, will fill in for Frotte at NRG Yield.

The company is in the midst of cutting costs and shifting away from its renewable-power businesses. Although NRG turned a small profit in the third quarter, the company is struggling with declining revenues from its coal-fired power plants, while its solar business is draining money and still finding its footing.

More: Houston Chronicle

PSE&G Gets OK to Replace 510 Miles of Gas Mains with Plastic

Public Service Electric and Gas has received regulatory approval for a $905 million plan to replace more than 500 miles of cast iron and steel gas mains with plastic mains over the next three years.

PSE&G said it wants to pursue the project while the price of natural gas remains low.

The work, set to begin after the ground thaws early next year, is expected to raise gas rates by about 1.5% annually for four years.

More: Associated Press

Oil Rig Counts Continue to Fall in Conjunction with Prices

The number of working oil rigs fell by 10 this week to 564, down more than 1,000 in a year, according to oil field services company Baker Hughes.

Some of the rigs will go back into operation if the price of oil climbs, but for now, it is becoming common for companies to idle them.

More: Houston Chronicle; Baker Hughes

Eversource Customers in Mass. to See Cut in Electric Rates

eversourceThe Massachusetts Department of Public Utilities approved a 28% rate decrease for some Eversource Energy customers. The residential rate on Jan. 1 will be set at 10.804 cents/kWh, compared to last winter’s price of 15.046 cents/kWh.

The typical monthly residential bill in the Greater Boston and MetroWest areas will be about $101, compared to $122 last winter. Average residential bills in the South Shore, Greater New Bedford and Cape Cod regions will fall from $124 to about $103.

More: WCVB

Equinix Partners with NextEra, Invenergy to Power Data Centers

Equinix, a provider of interconnection and data center services, has signed power purchase agreements with affiliates of NextEra Energy Resources and Invenergy for wind energy in Oklahoma and Texas.

Equinix said the agreements will provide a combined 225 MW of capacity, fully powering all of the company’s data centers in North America by the end of 2016, and nearly doubling its worldwide purchases of renewable energy.

A NextEra affiliate will supply 125 MW of wind capacity that is expected to produce 556 GWh a year from the Rush Springs Renewable Generation Facility in Oklahoma.

More: Equinix

Iberdrola USA Name to Change

AvangridNewNameSourceIberdrolaIberdrola USA plans to change its name to Avangrid following its merger with UIL Holdings, according to a filing with the Securities and Exchange Commission.

The subsidiary of Spanish energy giant Iberdrola indicated when it announced the merger with UIL that it would take on a new name. UIL owns United Illuminating in Connecticut and three New England gas distribution companies. Iberdrola USA, which has a large wind energy business, also owns Central Maine Power, Maine Natural Gas, New York State Electric and Gas and Rochester Gas and Electric.

Michael West, a spokesman for UIL, said the new name involves only the U.S. holding company. The utilities will continue to operate under their familiar names.

More: New Haven Register

GE Moves Renewable Energy Unit to Paris

GeneralElectricSourceWikiGeneral Electric has officially moved its renewable energy headquarters from New York state to Paris following its $10 billion acquisition of the energy business of French conglomerate Alstom SA.

The move was a concession to the French government, and Alstom’s offshore wind business was regarded as the stronger business unit. The new renewable energy business will focus increasingly on offshore wind. GE’s onshore wind unit will remain in Schenectady.

More: Albany Times Union

FERC Orders RTOs to Report on Out-of-Market Actions, Uplift

By Rich Heidorn Jr.

FERC last week ordered RTOs and ISOs to file reports detailing their current practices and planned changes on five price formation issues, saying it needed more information before taking substantive action.

The order (AD14-14) continues an initiative the commission began in 2014 with the first of three workshops. (See FERC to Tackle RTO Uplift, Price Formation.)

In September, the commission issued a Notice of Proposed Rulemaking that would require RTOs and ISOs to align their settlement and dispatch intervals, saying it was the first of a number of proposals on which the commission plans to act. (See NOPR Requires RTOs Switch to 5-Minute Settlements.)

FERC said last week that the RTO/ISO reports, due in 75 days, will help it identify best practices and inform its future actions. It asked for information on:

  • pricing of fast-start resources;
  • commitments to manage multiple contingencies;
  • look-ahead modeling;
  • uplift allocation; and
  • transparency.

“Identifying best practices for these five areas should provide incentives to maintain reliability, to facilitate accurate and transparent pricing, to reduce uplift, and for market participants to operate consistent with dispatch signals,” the commission wrote. “We have selected these areas because the discussion at the price formation workshops and the comments received after the workshops suggest that a number of RTOs and ISOs have sufficient experience with these areas such that we may be able to discern best practices and understand unintended consequences.

ferc
(Click to zoom.)

“The commission seeks this information not only to answer technical questions regarding how each RTO/ISO addresses these topics, but also to understand the reasons why each RTO/ISO has made its set of policy choices,” it added.

Commissioner Cheryl LaFleur said the issue is one of the commission’s most important initiatives, particularly because of the shift from coal to lower carbon resources. “I know there’s been a lot of anticipation and even impatience for action in this area,” she said. “This is the second in a series of orders; I don’t believe it will be the last.”

Commissioner Tony Clark said the energy markets “are our best performing and most mature markets.”

“So it seems to me that this is an appropriate manner in which to deal with this … so that we take it one bite at a time and we don’t have secondary unintended effects [that might occur] if we were to act all at once.”

Commissioner Colette Honorable noted that some have complained that work on price formation issues has “stalled” in RTO stakeholder processes.

“While we are working, I want to gently ask that [stakeholders] continue working, too, and that if you identify market flaws and other issues that need to be addressed, please continue to demonstrate your leadership.”

FERC Accepts NYISO Compliance Filing

 

  • FERC last week accepted a compliance filing by NYISO regarding its revised compensation methodology governing the provision of frequency regulation service under Order 755. “We believe that NYISO has demonstrated that its interim market power mitigation measures have successfully limited opportunities for firms to benefit from bidding regulation movement above marginal costs, and therefore meet the requirements of Order No. 755,” FERC wrote (ER12-1653).
  • nyisoFERC granted New York Transco’s request to delay the posting of its net adjusted revenue requirement, which had been due Sept. 30, 2015. The commission noted that some of the elements of the revenue requirement are the subject of ongoing settlement judge procedures and thus not available (ER15-572). The case relates to five transmission projects intended to serve New York City and respond to the potential closure of the Indian Point nuclear plant. (See Divided FERC Trims ROE on NY Tx Projects, Orders Hearing.)

William Opalka

Northeast Energy Direct Files for FERC Certificate

By William Opalka

Tennessee Gas Pipeline on Friday filed an application with FERC for a certificate of public convenience and necessity for the Northeast Energy Direct pipeline (CP16-21).

Tennessee Gas, a unit of Kinder Morgan, is seeking FERC approval in the fourth quarter of 2016, with construction starting in January 2017 and an in-service date of Nov. 1, 2018. The company estimates the project will cost $5.2 billion.

“Adding the NED project capacity to transport incremental natural gas supplies will ease natural gas capacity constraints and is expected to provide significant benefits to energy consumers in the region in the form of lower natural gas and electricity prices,” the application says.

The project consists of two components that will transport natural gas from the Marcellus shale gas region of Pennsylvania to New England.

The supply path component is a 174-mile segment from Bradford County in northern Pennsylvania to an existing compressor in Wright, N.Y. The segment can transport 1.23 million dekatherms per day, of which Tennessee Gas says it has long-term contracts for 552,262 dekatherms per day.

The market path component continues from Wright for 188 miles through New York and Massachusetts, turning slightly north into New Hampshire and then moving south to its end in Dracut, Mass. This route has a capacity of 1.3 million dekatherms per day, with contracts for 751,650 dekatherms per day.

The staff of the New Hampshire Public Utilities Commission has released a report that said Northeast Energy Direct is its preferred project of several proposed natural gas pipelines to ease supply constraints. (See NH PUC Staff: Northeast Energy Direct Pipeline Would Lower Power Prices.)

SPP Briefs

SPP has responded to stakeholder feedback by making several tweaks to its redesigned website.

Many of the improvements were to the site’s search function, which now returns results sorted with the most recently posted documents first and includes the ability to filter results by file type.

After logging in to their profiles on the site, users are now returned to the page they were previously viewing, rather than being taken to their profile page. Changes have also been made to simplify registration for meetings and other events.

Calendar (ICS) files sent to users after meeting registrations now include hotel information and have been reformatted to display all information in a more readable manner.

The RTO is accepting feedback on the revamped website, which went live last month, via email. (See SPP Unveils Redesigned Website.)

The RTO said its website project team is already at work on another set of improvements, to come in the next several weeks.

ECC, Gas-Day Testing to Begin with ‘Big Bang’

SPP staff told stakeholders last week to expect a “big bang” testing approach — an apparent reference to the complexity and breadth of the systems involved — next summer and fall as it continues to develop the markets system’s enhanced combined-cycle (ECC) software. (See “Enhanced Combined-Cycle Project Moves Forward” in SPP Board of Directors/Members Committee Briefs.)

spp
(Click to zoom.)

The ECC project, intended to provide more sophisticated modeling that captures combined-cycle plants’ flexibility, is being conducted in conjunction with improving gas market-clearing logic. SPP anticipates market participants will be able to begin gas-day testing in August and ECC testing in December.

The testing will involve more than a dozen systems or interfaces, four different vendors and seven SPP departments. At least two other system revisions will be released in addition to the ECC/gas-day releases.

Staff told SPP’s Change Working Group — which is responsible for implementing changes affecting markets and members — said it would deliver quarterly releases of the markets systems through 2016, making incremental improvements to the ECC functionality. One project manager said the team will have to see how downstream systems are affected as it gathers upstream system requirements.

Adding to the project’s complexity is the market-clearing engine, or, as SPP’s Jim Gonzalez said, “The actual calculator.” The ECC logic is so complex, Gonzalez said, the clearing engine has to run 20 times to produce a good solution.

– Tom Kleckner

MISO Briefs

MISO’s Steering Committee put its own operations under inspection during a Nov. 19 meeting, when it addressed stakeholder concerns that meeting materials are being posted too late.

Michelle Bloodworth, MISO’s executive director of external and stakeholder affairs, said meeting and agenda materials should be posted at least a week before the meeting under governance guidelines.

“We have not forgotten this and we’re taking a lot of strides internally,” Bloodworth said, adding that MISO is looking at different options on how to notify stakeholders when materials are posted.

MISO management will address the committee’s concerns on posting and discuss verbal updates versus updates accompanied by posted materials at an informational forum Dec. 15.

The Steering Committee went over a tentative schedule of monthly 2016 meetings. In light of the impending stakeholder redesign, the committee is embracing a “business as usual” policy through March until a more defined plan emerges from the stakeholder redesign committee. (See MISO Board Reduces Meeting Schedule; AC Likely to Follow.)

Also during the meeting, the closed Operations Working Group and the closed Operations Planning Working Group were merged by vote into the temporarily named Confidential Reliability Working Group. The Steering Committee also gave the go-ahead on a draft charter and management plan for the newly merged entity. The group’s purpose is to “provide a forum to promote the reliability of the Bulk Electric System and to develop, review and recommend operational planning practices,” according to the draft management plan.

Kent Feliks, chair of the Market Subcommittee, asked the Steering Committee for ideas on how the subcommittee should address projects that are withdrawn from MISO’s market roadmaps. Currently, there’s no procedure in place for projects that drop out of the 2017-2019 Market Roadmap. Feliks said a possible procedure and improvements to MISO Market Roadmap process will be discussed at the Dec. 1 Market Subcommittee meeting.

MISO Tops Wind Record, Reports Low October Energy Prices

misoTodd Ramey, vice president of system operations and market services, told an informational forum last week that the RTO set a new wind generation record Oct. 28, with instantaneous output of 12.4 GW, breaking the previous record of 11.9 GW, set Jan. 8. Wind produced 4.1 TWh for the month, up from 2.9 TWh in September and 3.6 TWh in October 2014.

Meanwhile, at a MISO informational forum held Nov. 18, the RTO reported relatively low wholesale energy prices for the month of October, owing to inexpensive fuel prices, strong wind farm output and slightly higher temperatures above historic October averages.

According to a MISO presentation, load peaked at 84.6 GW on Oct. 8, significantly less than September’s peak of 113.9 GW. Average load for the month was 68.6 GW, down 2.4% from October 2014.

LMPs averaged $25.34/MWh in October, down from $26.80/MWh in September and $32.44/MWh in October 2014.

MISO Launches ‘Jargon-Free’ Blog

misoMISO last week introduced a blog, MISO Matters, an effort to increase understanding of RTO operations by simplifying technical topics. The first entry features breakdowns of peak load, automatic reserve sharing and the MISO Transmission Expansion Plan.

“We will feature what MISO is doing around big topics, like [the Clean Power Plan] and transmission planning, but also try and explain some of the day-to-day business operations,” MISO spokesman Andy Schonert said. “Most of all, the goal of the blog is to tell MISO’s story free of jargon and acronyms, and explain what MISO does on a daily basis.”

— Amanda Durish Cook

FERC Accepts SPP Request for 2015 Expert Panel

FERC on Friday accepted SPP’s request to waive Tariff provisions governing the selection of an industry expert panel, allowing it to use one of its 2016 panelists to complete the 2015 panel evaluating proposals for the RTO’s first competitive solicitation under Order 1000 (ER16-126).

SPP filed the waiver request with FERC on Oct. 20, saying that the only candidate in its 2015 pool with expertise in one of five subject areas required wouldn’t be able to serve. (See SPP Seeks Waiver on Panel; Sets New Wind Records.)

FERC found “good cause” to grant SPP’s requested waiver, saying it “will remedy a concrete problem and allow for regulatory certainty regarding review of the proposals submitted for the project.”

FERC noted the waiver requested was of limited scope, covering just two subsections of SPP’s Tariff and it addressed a one-time event. The commission said the request “will create no undesirable consequences since the candidate’s qualifications will be reviewed and approved by both the Oversight Committee and the SPP Board of Directors prior to serving on the IEP.”

— Tom Kleckner