Search
`
July 31, 2024

Panelists Warn of Winter Weather’s National Security Risks

After multiple severe weather events threatened grid reliability in recent years, the ongoing threat of winter weather is well known. But in a webinar hosted by the American Council on Renewable Energy on Dec. 5, several speakers said the risks to one particular customer are not fully appreciated.

Planning processes “do not take Department of Defense or national security loads into account,” said Jonathon Monken, a principal at consulting firm Converge Strategies. According to the most recently available data for fiscal 2021, there were more than 6,000 energy outages at DOD installations across the U.S., he said. The potential for mission impact is significant. “As far as I know, they’re the only [grid] customer that launches nuclear missiles.”

The webinar focused on the dangers extreme weather could pose to electric reliability at military bases and other critical national security loads. The topic was timely, considering multiple reports in the past month highlighting the risk of extreme weather events to grid reliability.

NERC’s 2023 Winter Reliability Assessment, released last month, provided plenty of material for panelists, as did FERC and NERC’s final report on the December 2022 winter storms that caused widespread load shed across the Southeast U.S., released the same week. (See FERC-NERC Elliott Report Calls Winter Outages ‘Unacceptable’.) NERC’s assessment found that large portions of the North American electric grid are at risk of electric shortfalls in above-normal peak conditions. (See NERC: Grid Risks Widespread in Winter Months.)

Thomas Coleman, executive director of energy think tank SAFE’s grid security project, emphasized that the danger of military bases losing power goes beyond that of a typical business, because “each military installation is very unique” in terms of national security benefits.

Monken said part of the challenge is that “DOD is not steeped in a very deep understanding of how the [grid] works,” and base commanders in particular do not always understand the importance of “what’s happening outside of their fence line with regard to critical infrastructure.” He pointed out that 90% of DOD bases depend on commercial utilities for energy, and there are multiple areas in the country where clusters of military bases all rely on the same energy provider, creating a major common point of vulnerability.

Monken and Coleman suggested investments in transmission could help mitigate these vulnerabilities by removing some of these single points of failure. They said they hoped NERC’s Interregional Transfer Capability Study, which Congress ordered the ERO to complete by next December, would be an important step in identifying the places where transmission investments could help the most — not just for protecting national security, but with encouraging the adoption of renewable energy sources.

“Wind power in Iowa … is so much less expensive than what we’re seeing in New York and L.A. on the coasts, but we don’t really have the way to transmit those electrons to the coasts,” Coleman said.

Mark Olson, NERC’s manager of reliability assessments, said if grid planners and DOD work together, they can help understand each other’s needs and abilities. He said future studies can ensure the grid has the flexibility to always optimize energy use, rather than just avoid major catastrophes.

“We really need to understand all the unserved energy that is occurring over the span of a year … and when we can get our tools and planning processes to be able to have that kind of granular view, we’re in a much better position to be able to make sure all the critical needs are being met,” Olson said.

Maine Ethics Commission Resolves Probe of NECEC Foes

Maine’s ethics watchdog has resolved alleged campaign finance law violations surrounding the controversial New England Clean Energy Connect project.

The two entities targeted in a probe by the Maine Commission on Governmental Ethics and Election Practices consented to a combined $210,000 in penalties in an agreement executed Nov. 29. Neither admitted liability or wrongdoing, but both agreed they should have registered as a political action committee or ballot question committee.

The NECEC line is designed to carry up to 1.2 GW of electricity from hydro facilities in Quebec to Massachusetts. It has faced multiple challenges since it was first proposed in 2017, including a citizen referendum seeking to block construction. Avangrid resumed construction in August 2023, four months after winning a key court ruling. (See New England Clean Energy Connect Wins Court Battle.)

Two separate but related cases arising from the fight over NECEC went before the Maine ethics commission, one involving Clean Energy for ME LLC (doing business as Stop the Corridor), the other involving Alpine Initiatives LLC.

Advocates for NECEC complained in January 2020 that Stop the Corridor should have registered as a political action committee because it engaged in financial activities to support petitioning for a citizen initiative on the project.

Stop the Corridor challenged the ethics probe, dragging out the time frame.

The commission ultimately gathered 6,339 pages of documents and conducted five interviews to show the involvement of Stop the Corridor in efforts to block NECEC or impede progress on it.

The commission concluded Stop the Corridor qualified as a ballot action committee, should have registered with the commission and should have filed campaign finance reports.

Among its other findings, the commission discovered Stop the Corridor made payments to Alpine Initiatives. A consultant transferred $160,000 to Alpine, which then donated $150,000 to the Maine Democratic Party, the leaders of which were viewed as more likely to oppose NECEC.

The public did not learn of the source of this pass-through contribution because it was reported only in Alpine’s name.

The commission began to investigate Alpine in July 2021, concluded Alpine through its actions did qualify as a political action committee and said it should have registered as such and filed a campaign finance report.

Alpine agreed to pay $160,000 in civil penalties, and Stop the Corridor agreed to pay $50,000.

Supporting documentation posted in the Spot the Corridor case shows only one source of money: $95,726 provided by NextEra Energy Resources from August 2019 to March 2020.

NextEra operates the 1.24 GW nuclear power station in Seabrook, N.H., and through the years, the Florida-based utility has run interference on the NECEC project, which would provide an influx of low-cost clean energy competing with the emissions-free output of Seabrook.

A late 2021 report indicated NextEra spent $20 million to influence public opinion against NECEC in the runup to the Maine referendum.

Hydro Fuels Uptick in CAISO Exports, Market Monitor Reports

CAISO’s net energy exports have increased sharply this year, with imports being displaced by increased output from California’s hydroelectric and natural gas resources, the ISO’s Department of Market Monitoring (DMM) said Dec. 1.

Speaking during a call to discuss the DMM’s market report for the first and second quarters of 2023, Amelia Blanke, the department’s manager of monitoring and reporting, said the trend reflected the reduction in imports and a “tremendous amount” of exports coming out of CAISO into the Western Energy Imbalance Market, flowing into the Southwest and Northwest, with substantial volumes going into BC Hydro’s territory.

The flows tended to reverse during CAISO’s net load peak hours, she said — except for the exports into BC Hydro. Most of the imports into CAISO came from the Desert Southwest.

While the DMM hasn’t released the Q3 report, Blanke noted the quarter saw “absolutely unprecedented levels of exports.”

The Monitor highlighted the significant role hydro played for California this year.

“The weather pattern that prevailed coming into 2023 is one that resulted in relatively high rainfall and snowfall in the CAISO BA,” Blanke said. There was less precipitation in the Northwest, though, resulting in a relative shift of hydroelectric output between the Northwest and CAISO’s footprint.

The strong hydro equated to low prices during many intervals in Q1 and Q2. Those quarters typically see the highest levels of hydropower in combination with solar and wind, increasing the frequency of intervals with very low — and even negative — prices.

Blanke also highlighted the new resources that have been added to the CAISO fleet, including a “very large penetration” of battery resources.

The year began with high natural gas prices, which declined across the system in Q2, bringing wholesale electricity prices down as well, Blanke said.

Q1 electricity prices average about $97/MWh in the day-ahead market, $93/MWh in the 15-minute market and $87/MWh in the five-minute market. Q2 saw much lower prices across the board, though there was still a persistent gap between the five- and 15-minute markets, and lower 15-minute prices on average compared with the day-ahead, boosting the profitability of virtual supply.

“Historically, that’s been due in large part to a consistent imbalance conformance for the CAISO BA,” Blanke said, referring to the process by which the ISO dispatches units up and down to match grid conditions to prevent frequency deviations.

While CAISO has assumed that it can rely on flexible ramping resources to reduce the need for imbalance conformance, that did not hold for most of the period in covered by the analysis.

But CAISO did change some operational practices in the middle of Q2 to reduce the need for conformance.

“It was the first time in many years that our quarterly metrics show a reduction in imbalance conformance,” Blanke said.

Former Ohio PUC Chair Charged with Bribery

Former Public Utilities Commission of Ohio Chair Sam Randazzo has been indicted on several bribery charges alleging that FirstEnergy paid him over $4 million before his appointment in 2019 with the understanding that he would act in the company’s interest. 

“Today’s indictment outlines an alleged scheme in which a public regulatory official ignored the Ohio consumers he was responsible for protecting, instead taking a bribe from an energy company seeking favors,” FBI Cincinnati Special Agent in Charge William Rivers said in an announcement of the charges. “The FBI will remain vigilant in investigating allegations of corruption at all levels of government and hold those who violate the law accountable for their actions.” 

Randazzo served as commission chair from April 2019 until November 2020, when he resigned following an FBI raid on his home in Columbus. He was indicted on Nov. 29 of this year with two counts of travel act bribery, one count of wire fraud, five counts of making illegal monetary transactions, two counts of honest services wire fraud, and one count of conspiring to commit travel act bribery and honest services wire fraud. 

FirstEnergy spokesperson Jennifer Young said the company cannot comment on the allegations; however, it has sought to remedy past issues. The company agreed to pay a $230 million fine in July for allegedly spending $61 million in bribes, campaign contributions and advertising for the election of former Ohio House Speaker Larry Householder, who supported a bill providing $1.5 billion in subsidies for the company’s nuclear plants. (See DOJ Orders $230 Million Fine for FirstEnergy.) 

“While we can’t comment on the actions taken by the U.S. Attorney’s Office for the Southern District of Ohio, FirstEnergy has taken significant steps to put past issues behind us. Today we are a different, stronger company with a sound strategy and focused on a bright future,” Young said in an email. 

According to the indictment, Randazzo solicited a $4.3 million payment from former FirstEnergy CEO Charles Jones and Michael Dowling, former senior vice president of external affairs, in late 2018 in exchange for seeking a position on the commission to aid the company. After meeting with two executives at his home in December, Randazzo allegedly arranged the payment, which was made on Jan. 2, 2019, and the executives lobbied for his appointment. The indictment included messages between the executives and Randazzo. 

“We’re gonna get this handled this year, paid in full, no discount. Don’t forget about us or Hurricane [Jones] may show up on your doorstep! Of course, no guarantee he won’t show up sometime anyway,” one executive messaged Randazzo, accompanied by an “image of a venomous snake protruding from a hurricane.” 

“Made me laugh — you guys are welcome anytime and anywhere I can open the door. Let me know how you want me to structure the invoices. Thanks,” Randazzo responded, according to the indictment. He added, “I think I said this last night, but just in case — if asked by the administration to go for the chair spot, I would say ‘yes.’” 

After his appointment in April 2019, the indictment shows further messages between the executives and Randazzo discussing how he could aid the company in ensuring the passage of House Bill 6, which provided subsidies for the company’s nuclear plants, and help a financial issue they referred to as the “Ohio 2024 hole.” 

A series of messages between executives said, “Stock is gonna get hit with Ohio 2024. Need Sam to get rid of the ‘Ohio 2024 hole.’” 

Another executive responded, “I spoke with Sam today. Told me 2024 issue will be handled next Thursday.” The announcement of the charges stated that the commission issued an order the following Thursday alleviating the issue. 

In another message sent on March 4, 2020, an executive recounted being told by Randazzo that he would help with an issue the company was facing but needed time because of discussions circulating among commission staff about his allegiances. 

“He will get it done for us but cannot just jettison all process. Says the combination of overruling staff and other commissioners on decoupling, getting rid of SEET [significantly excessive earnings tests] and burning the DMR [distribution modernization rider] final report has a lot of talk going on in the halls of PUCO about does he work there or for us? He’ll move it as fast as he can. Better come up with a short-term workaround,” the message said. 

The indictment also alleges Randazzo embezzled at least $1 million from an industry group representing large industrial energy users in Ohio through his consulting firm Sustainability Funding Alliance of Ohio going as far back as 2010. When the group received settlement payments to be distributed among its membership, it said Randazzo used his control of its bank accounts to divert a portion of the payments to a fictitious member he created. He allegedly attempted to conceal the embezzlement by sending the funds through multiple bank accounts and concealing the amount the group received. 

The announcement states that Randazzo could face 20 years in prison if convicted. 

“Public officials whether elected or appointed — are tasked with upholding the highest level of integrity in their duties and responsibilities. Such service to the public must be selfless, not selfish,” U.S. Attorney Kenneth Parker said in the announcement. “Through the indictment unsealed today, we seek to hold Randazzo accountable for his alleged illegal activities.”

4 Things Cathy Zoi Learned About the Car-charging Business as Head of EVgo

When Cathy Zoi joined charging company EVgo as its CEO in 2017, only a couple of electric vehicle models were for sale, and their range was limited to about 70 miles.

Founded in 2010 as a unit of NRG Energy, EVgo had only 50 employees and no revenue model. By the time Zoi retired from the company in November, it had about 300 employees, and more than 40 EV models were for sale in the U.S., many with a range over 300 miles. Although EVgo, now owned by LS Power, has yet to earn a profit, Zoi is bullish on the industry’s future.

“Now, there’s not a car company that is not investing significantly in electrifying its offerings — to the tune of a trillion dollars globally,” she said in an interview with Resources for the Future CEO Richard G. Newell on Nov. 29 as part of its Policy Leadership Series of webinars. “That is a once-in-a-century transformation of a major sector that is happening present tense. … I did not anticipate that amount of commitment by private capital would happen so quickly. And that’s really, really heartening.”

The industry’s biggest challenge now is creating the charging infrastructure needed to make new converts confident they won’t get stranded without power, Zoi said. “What is probably underestimated by everybody was the complexity of building a new ecosystem,” she said.

Zoi told Newell and an audience in D.C. she is unfazed by reports of automakers pulling back on their EV plans.

Former EVgo CEO Cathy Zoi spoke with Resources for the Future CEO Richard G. Newell during a webinar Nov. 29. | Resources for the Future

“I think it’s an ephemeral thing,” she said. “If they’re pulling back, they’re pulling back from a slope that was like this,” she said, pointing steeply upward, “to a slope that was like that” — less steep. “It’s still very, very fast compound annual growth rates. You know, maybe the new model was going to come out in Q1 next year, [and] it’s going to come out in Q3 instead.”

Nor is she concerned that a Republican president or Congress will seek to halt EVs’ growth, saying elected officials will not want to lose the jobs resulting from the EV and battery factories that have been announced since the Inflation Reduction Act and Infrastructure Investment and Jobs Act.

“There were elected members of office in this town that might have been hostile to clean energy because it’s environmental. And yet, their constituents — the farmers of Iowa — are making more money out of having wind turbines on their property than they are out of the corn they’re selling and the soybeans they are growing,” she said.

“On the consumer side, I have not talked to a driver who has experienced an EV and doesn’t adore it,” she continued. “And this is why you’ve got the market growing in Texas, in Florida, as quickly as it is. They are really great products. They’re fun to drive; it’s a better-performing technology. And you know, people say, ‘I love not having to go to a gas station anymore.’”

Reality check: While EVs have fewer moving parts than internal combustion engine (ICE) vehicles, and thus should need fewer repairs, Consumer Reports says EV owners continue to report far more problems than owners of conventional cars or hybrids. Many drivers of EVs other than Teslas have complained about nonworking chargers. S&P Global Mobility says half of EV owners — excluding those with Teslas — go back to ICE vehicles as either a replacement car or a second vehicle for their household.

Scaling Up

Zoi is optimistic the industry can meet the Biden administration’s target of making EVs half of new car sales by 2030.

The U.S., which has 30,000 fast chargers, will need 200,000 to 300,000 by 2030, she said.

EVgo — which has 3,400 DC fast-charging stalls in operation or under construction at more than 950 locations nationwide — has identified about 10,000 sites for additional chargers, assuming available capital.

“So I can tell you on the charging side, we’re up to the task. … But as I mentioned, it’s a whole ecosystem,” she said. That means utilities must upgrade distribution grids, and carmakers must transform from ICE vehicles to EVs. “So it’s ambitious, but achievable.”

Below are four things Zoi learned in her time at EVgo, with implications for the industry:

  1. People like to top off at the store even if they have home chargers.

The demand for DC fast chargers has grown faster than expected, Zoi said.

“We thought the whole idea was if you can charge at home, you’re only going to charge at home. Turns out that’s not the case. If you have a charging station conveniently located at your grocery store, people are topping up there. It’s a good parking space. [They will] spend five bucks while they’re going to get their weekly groceries.”

Another factor: “The … EVs that are being sold, [their] batteries are bigger, and they’re heavier. And so they’re a little less efficient … than we originally forecast, which means that the folks need to fill up more frequently.”

EVgo’s national use rate — the percent of time a charger is in use — is more than 15%, with some stations, such as one in Brooklyn, in use more than 50% of the time.

  1. Only some customers are price responsive.

The company has seen a wide range of price elasticity as it has adopted time-of-use pricing.

“Some of our drivers are very price responsive, like our rideshare drivers. Others do not care at all,” she said.

After joining the company, Zoi imposed a rule that it should make a profit on every kilowatt-hour dispensed, which required it to abandon its single national price.

“In order to not lose money in San Diego … we had to double our rates,” she said. “And the demand dipped a little bit for a couple of weeks, and then it went right back up.”

The average out-of-pocket spend per charging session is about $10, not including monthly subscription fees of up to $13. “So it’s two Starbucks things, right? It’s just not that much money. And you come out and you’ve got electrons in your car, and off you go, and you feel great.”

  1. It takes a long time to plug into utility distribution lines.

It takes between six and 18 months from site identification to having the station go live, Zoi said, far from hopes of a six-month turnaround.

“Because we’d like to build stations with at least 10 stalls, now it almost always requires a service upgrade, which means that the utilities buy a transformer … and the site host has to allow the utility access to the site. … It turns out that landlords — we don’t own the land — don’t like utilities tromping on their [property]. And then at the back end, in order for a station to go live, the utility has to come and do the final inspection before we enter. And we are often in the queue for something like six, eight, 12 weeks until they show up.”

EVgo is trying to shorten the timeline by providing utilities with its siting plans for the next 18 to 24 months. “We say this is where we’d like to build … and sometimes they say, ‘Oh my gosh, don’t build here, because we’re really constrained,’ or ‘We’re not going to upgrade that local connector until 2027.’ But they usually say, ‘Great. Now we’ll order transformers for all these locations.’

“As we get into larger, heavy-duty trucks being electrified, those are going to be megawatt[-scale] charging stations that need to be integrated into utility plans — like in a big way.”

  1. Chevron needs to improve its menu.

The biggest share of EVgo’s $35.1 million in revenue in the third quarter — up 234% year-over-year — was from retail chargers. It has partnerships with shopping center owners; Target; Chase Bank; Lowe’s; supermarkets Kroger, Safeway and ShopRite; and convenience store chains Sheetz and Wawa.

“We like to build where people are anyway. … So you can just plug in, go do something else and come back, and the car’s charged,” Zoi said.

It is also building depots with 20 or 30 stalls for fleet customers. And on highways, it has a partnership with Pilot Flying J truck stops for “white label” chargers owned by Flying J and built and maintained by EVgo.

And it’s experimenting with gas stations through 14 Chevron locations in California.

“I always used to joke with them … ‘You guys are going to need to improve the quality of your coffee if you’re going to get people to want to stay. Because we also partner with Whole Foods. And would you rather [hang] at Whole Foods, or [eat] beef jerky at Chevron?’”

OPSI Urges Reliability Coordination Between PJM, States

PJM is taking a reactive stance in addressing the evolving grid, impacting ratepayers and reliability in a way that could be addressed by closer coordination with member states, the Organization of PJM States Inc. (OPSI) has told the RTO’s Board of Managers. 

OPSI leveled its contention in a Nov. 28 letter that said increases in both load and generation retirements are leading to reliability risks that require major “immediate need” transmission expansions with little time for exploration of alternatives.  

The group said the $5 billion Regional Transmission Expansion Plan (RTEP) project PJM presented its Transmission Expansion Advisory Committee (TEAC) on Oct. 31 highlights the “negative impact of siloed, reactive planning” that states have been concerned about for years. The TEAC is scheduled to discuss the proposal again on Nov. 5, and the board may consider approval in the coming weeks. (See PJM Recommends $5B in RTEP Transmission Projects.) 

“The reliability challenges that have recently presented themselves, coupled with the significant cost impact on customers associated with addressing these challenges, have amplified our concern that factors outside the transmission planning process may contribute to the high cost of transmission upgrades and warrant attention to ensure these costs do not become an undue burden to retail consumers,” the letter said. “As such, the OPSI board requests your support in working hand-in-hand, with the help of our respective staffs, to better understand the issues and explore solutions, tools and reforms that may more timely and cost effectively ensure grid reliability.” 

In addition to its concerns with the transmission planning process, OPSI said the need for reliability-must-run (RMR) contracts to keep generators online past their deactivation date threatens to saddle ratepayers with a second round of expenses on top of transmission needed to accommodate the retirement. 

“These concerns range from transmission projects designated as ‘immediate need,’ even though many of them have remained uncompleted past their required in-service dates, to multiyear reliability-must-run agreements that can cost customers hundreds of millions of dollars per year, all while the region waits for even costlier transmission upgrades,” OPSI wrote. “What’s more, the costs of these RMR agreements are not factored in selecting the most overall cost-effective reliability solutions. As such, the PJM board should not read this letter as a reaction to a single set of RTEP projects, but rather a culmination of concerns that is only growing and that has resulted in our resolve to timely seek solutions through our boards working together.” 

The letter was signed by 13 of the 14 OPSI member commissions, with only the Virginia State Corporation Commission voting in opposition. The Virginia agency did not respond to a request for comment on the letter. 

The letter notes that PJM has undertaken efforts to address the reliability concerns it has identified over the past year, including an overhaul of the capacity market through the critical issue fast path process and a long-term transmission planning working group, but OPSI said more work is needed to explore holistic solutions to grid reliability. 

‘Eye-popping’ Transmission Needs

Maryland Public Service Commissioner Michael Richard, who also serves as OPSI treasurer, said state policies have a central role to play in promoting the clean energy transition while maintaining reliability in the most cost-effective manner.  

Richard said if the states were brought on board with planning the response to data center growth in Northern Virginia and the retirement of the Brandon Shores generator outside Baltimore, both of which contributed to the $5 billion RTEP project, recent Maryland legislation requiring the development of 3 GW of storage could have provided a non-transmission solution at a lower cost for ratepayers. (See Maryland Legislature Ends Session with Big Wins for Clean Energy.) 

“There are things that we can do at the state level, at the distribution level, to help address and take action regarding demand and some of the distributed energy resources that we’re working to bring on,” he said. “We have a lot of storage projects in the queue and if we just had more visibility into where the reliability concerns are, it’s very possible we could tap some of those storage resources to address some of the concerns PJM has.” 

While Richard said the scale of the transmission PJM has proposed was “eye-popping,” he thinks it reflects longstanding issues the states have had with PJM’s planning processes. He said the move to a cluster approach to studying generator interconnection requests marks a significant improvement, but work remains to improve PJM’s governance and create opportunities for collaboration with the states. 

“We do have good dialogue between OPSI and PJM and the states. I think we have good discussions, so I’m hopeful and again this letter is presented as an invitation, a request to work collaboratively with PJM. I know they tell us they take OPSI dialogue very seriously and so I expect they will do so with this letter,” he said. 

Morris Schreim, senior advisor to the Maryland Public Service Commission, said transmission is looked at as the last solution for meeting demand when the market signals don’t produce an adequate supply of generation. He said PJM should be seeking innovative ways to improve the interconnection process to ensure new resources aren’t held up, consider how federal policy around electrification and generation development can be incorporated, and work with states to find solutions on the distribution side of the grid. He said the discussions in PJM’s Deactivation Enhancements Senior Task Force to streamline the process for transferring capacity interconnection rights (CIRs) from a retiring resource to a replacement is a promising pathway. 

“They have an opportunity to come up with creative and innovative ways of making the parts work together,” he said. 

Kentucky Public Service Commissioner Kent Chandler, who also serves as OPSI president, said he hopes the letter can open avenues for his commission to work closer with PJM to find new ways of maximizing reliability at lower costs. 

“My overarching concern is that the PJM region is engaging in too much reactive engineering, and are just calling it planning,” Chandler said in an email. “At the same time, the region is too siloed at addressing needs, such as the chasm between supplemental and baseline planning. Customers can’t afford siloed, reactionary investments in the [bulk electric system], and doing so likely results in a more expensive and less reliable system. I look forward to working with PJM on how we can address this.” 

‘A Real Frustration’

Greg Poulos, executive director of the Consumer Advocates of the PJM States, said there’s widespread agreement among advocates on many of the issues raised in the letter. He said the advocates are concerned about the “extremely significant” costs ratepayers will face should the RTEP projects be approved and are frustrated with the short timeline between when PJM selects projects and seeks board approval. 

“There’s not many things that happen in such a short time period as this $5 billion project with this little input from stakeholders,” Poulos said. 

One of the chief reasons generator retirements such as Brandon Shores require extensive transmission development is the compressed Base Residual Auction schedule, which causes generators to receive the price signals to retire much closer to the start of the delivery year, Poulos said.  

PJM’s markets were designed to have generators seek deactivation three years in advance, but when that period is shortened, the amount of time to plan and construct solutions is likewise limited, increasing the odds of needing a costly RMR contract. Poulos anticipates the next major generation retirements also likely will provide little to no warning and come with even larger costs. 

“These decisions about when resources retire, you would think would be made three years and 90 days in advance of auctions. … You’ve cut that time down and put the pressure [on consumers] to address the situations and consumers to pay for situations,” he said. “One of the consequences is having these $5 billion retirement issues that are immediate needs, so we get less competition. It reduces the solutions when these things come on so fast. We need to really be thinking comprehensive long-term planning.” 

Poulos said consumer advocates also are frustrated about the lack of discussions around increasing the scope of PJM’s long-term planning. The Long-Term Regional Transmission Planning Workshop started this year addresses projects only of 345 kV or higher, which Poulos said limits its scope to a small fraction of the projects PJM might consider. 

“That long-term regional process is not aimed at the entire picture of how we go forward and that’s a real frustration,” he said. 

FERC Approves Texas RE Standards Process Changes

FERC on Dec. 1 approved a set of updates to the Texas Reliability Entity’s Reliability Standards Development Process (RSDP) intended to give more flexibility to the regional entity’s Member Representatives Committee to develop standards and align the document more closely to NERC’s Standard Processes Manual (SPM) (RR23-1).

NERC filed the RSDP changes with FERC in May, after the RE’s Board of Directors approved them at its quarterly meeting in February. (See “Regional Standards Process Approved,” Texas RE Board/MRC Briefs: Feb. 8, 2023.) The RSDP defines the process for adopting, approving, revising and retiring Texas RE’s regional standards, as well as for creating a regional variance to a NERC standard.

The approved changes will affect all 10 sections in the current RSDP to varying degrees, with most of the revisions in the first four sections. These comprise the introduction (Section 1), elements of reliability standards (Section 2), roles in the standard development process (Section 3) and the development process itself (Section 4).

In Section 1, Texas RE will merge the background section of the current RSDP — which “requires regional reliability standards to support one or more of the NERC reliability principles and to be consistent with the NERC market principles” — with the introduction. Additional revisions to this section add principles for standards development and assign the task of determining who may participate in standards development to the RE’s Reliability Standards Manager.

Next, Texas RE will move language from one of the current RSDP’s appendices to Section 2, adding references to NERC’s 10 Benchmarks of an Excellent Reliability Standard and changing terminology to be consistent with the SPM.

New language in Section 3 will specify that the MRC “may undertake reviews of [FERC] orders and coordinate with NERC in the development of NERC’s annual reliability standards development plan.”

Revisions to Section 4 require Texas RE to follow NERC’s evaluation procedure when developing new regional standards, create “distinct process steps” for creating standard authorization requests (SARs) and add a requirement for the MRC to be notified when a SAR is submitted. Public comment periods for SARs have been lengthened from 15 days to 30; comment periods for draft standards were extended from 30 days to 45, with a ballot in the last 15 days; and the MRC will now be required to meet at least once per quarter.

Additional changes to Section 4 include organizational updates removing language requiring standard drafting teams to assess the impact of a SAR on neighboring regions and creating more options for obtaining feedback on draft standards. The revisions also add voting positions, consolidate language and provide flexibility regarding the termination of unsuccessful projects and procedures if a draft standard does not pass industry ballot.

Updates to Sections 5 to 10 provide for regional reliability standards to be “considered for review at least every five years,” instead of requiring a review as is currently the case; list information that SARs must provide to the MRC; give reasons the MRC can reject requests for interpretation of regional standards; update the appeals process; and outline a method for conducting field tests that is consistent with NERC’s SPM.

Public Citizen Opposes Language on Markets

FERC received only one filing opposing the changes, from Public Citizen.

The advocacy group objected to language in the revised RSDP requiring reliability standards to “accommodate competitive electricity markets” on the grounds that market considerations are outside the ERO’s purview. It requested that any references to competitive markets be removed from the document.

In response, NERC defended the language, citing the Federal Power Act’s requirement that FERC “not defer [to the ERO] with respect to the effect of a standard on competition” and the commission’s order that proposed standards should have “no undue negative effect on competition.” NERC also observed that nearly identical language was already in the previous version of the RSDP, albeit in a different section.

FERC said Public Citizen’s request was “outside the scope of the instant proceeding” while echoing NERC’s observation that the proposed revisions “do not substantially differ from” previous versions of the RSDP. As a result, the group’s objections were rejected, and the new RSDP was approved, effective immediately.

ISO-NE Says Region Has Enough Resources for Upcoming Winter

ISO-NE projects it will have enough energy resources to maintain the grid throughout mild and moderate weather conditions this winter, the organization announced Dec. 4. Under more severe winter conditions, ISO-NE indicates some capacity deficiency actions may be required, but shortfall remains “unlikely.”  

While the RTO said it does not anticipate the need for controlled power outages, it cautioned that even in a mild winter, extended cold snaps still could stress the grid.   

The organization forecasts a peak demand of 20,269 MW under average weather conditions, and a 21,032-MW peak under below-average temperatures. This would be an increase compared to last winter’s 19,529-MW demand peak. ISO-NE anticipates winter peak demand increases will accelerate in the coming years due to electrification, surpassing 26,000 MW in 2032 and potentially reaching about 57,000 MW in 2050.  

For this winter, ISO-NE noted the National Oceanic and Atmospheric Administration projects above-average temperatures in New England, with more precipitation than usual in Southern New England and average precipitation in Northern New England.  

Temperature and weather patterns can impact both supply and demand on the grid, making weather “the largest driver of energy use and resource availability in New England,” according to the RTO. The organization touted its 21-day energy supply forecast, which it uses to anticipate and preempt supply constraints. 

“Seeing what’s coming is crucial to navigating any potential power system challenges, and our 21-day energy supply forecast is an operational tool that serves this very purpose,” ISO-NE CEO Gordon van Welie said in a statement. “It gives us situational awareness on energy adequacy over the operating horizon, allowing us to identify potential energy shortfalls while there’s still time to prevent them or lessen their impact.” 

The RTO has several out-of-market mechanisms in place intended to ensure grid reliability. This winter will feature the rollout of the Inventoried Energy Program (IEP), which will compensate generators for keeping up to three days of stored fuel on-site.  

The IEP is intended to be a short-term reliability solution, set to run for just two winters. It has been criticized by environmental groups as an unnecessary handout to fossil generators, while ISO-NE has argued it is an important reliability backstop for the region. (See FERC Upholds Ruling on ISO-NE’s IEP Payments.) 

This winter also will be the second and final year of the Mystic Cost-of-Service Agreement (COSA), which has delayed the retirement of the Mystic generation station. Mystic is the main customer of the Everett LNG import terminal, and Mystic’s retirement would necessitate a new source of funding to keep the import terminal open. The generator is set to retire when the COSA expires at the end of May 2024, after which the future of Everett is uncertain.  

Officials from FERC, NERC and ISO-NE have expressed concern about the indirect impacts the retirement of Everett would have on electric reliability. (See FERC, NERC Leaders Voice Concern About Loss of Everett Marine Terminal.) 

However, there is little appetite in the region to extend the Mystic Agreement, which has been characterized by high costs and, according to some stakeholders, minimal grid reliability benefits. (See NE Stakeholders Debate Future of Everett at FERC Winter Gas-Elec Forum.) 

According to an ISO-NE report released in September, the agreement has cost ratepayers in the region over $572 million from its start in June 2022 through August 2023. Over this period, Mystic’s operational conditions have been characterized by the RTO as “in-merit operation” for just one month, compared to nine months of “tank congestion management” and five months where the facility was characterized as “predominantly offline.” 

ISO-NE’s modeling for 2027 and 2032 has indicated the presence of Everett would not provide significant reliability benefits to the grid. (See ISO-NE Study Highlights the Importance of OSW, Nuclear, Stored Fuel.) 

In the coming years, the region could see several new clean energy resources come online that likely will boost winter reliability. The 806-MW Vineyard Wind 1 project aims to achieve commercial operation by the end of 2024, while the 1,200-MW New England Clean Energy Connect transmission project expects to be in service by 2025. 

In the longer-term, ISO-NE’s ongoing Resource Capacity Accreditation project is intended increase capacity revenues for resources that provide reliability attributes to the grid, particularly during periods of winter stress. Under the RTO’s current schedule, these updates will be implemented in time for the winter of 2028/29. 

New York Issues Expedited Renewable Energy Solicitations

New York is moving quickly to keep its renewable energy development queue viable, launching solicitations for new onshore and offshore large-scale projects.

This new round is designed to move more quickly than previous New York solicitations, with hopes of restoring momentum to struggling projects and replacing any projects that are withdrawn.

Proposals under the state’s fourth competitive offshore wind solicitation (ORECRFP23-1) are due by Jan. 25, and award announcements are expected in February. Onshore developers have until Dec. 21 to establish eligibility for the seventh annual Renewable Energy Standard solicitation (RESRFP23-1). They must then submit proposals by Jan. 31, with award announcements also anticipated in February.

The Nov. 30 solicitation announcement followed a Public Service Commission decision in mid-October to not increase the reimbursement for several dozen contracted projects totaling more than 12 GW of nameplate capacity.

Developers had said they might not be able to start construction of the projects without more money, and there was speculation the PSC ruling would gut the clean energy portfolio the state is trying so hard to build.

But immediately after the PSC ruling, Gov. Kathy Hochul promised an expedited effort to help blunt its impact. The New York State Energy Research and Development Authority (NYSERDA) followed through with the solicitations for land-based and offshore projects.

The developers who had sought financial relief for projects awarded contracts under previous solicitations will be able to rebid those projects into this new solicitation.

This is key for offshore wind, given the lengthy timeline involved in planning and review of each project — a complete reset could set the state back years as it pursues statutory goals for emissions-free power.

The inflation-index option that was absent from early solicitations will be available to bidders in this latest request for proposals. Also, NYSERDA said it is streamlining the solicitation by removing certain bid requirements that were labor intensive to comply with but provided minimal value to officials evaluating the bids.

Offshore wind is a key component of the clean energy transition, promising gigawatts of emissions-free power.

A few projects are under construction or preparing to start construction in U.S. waters, having locked in their finances before spiraling costs clobbered the industry. But most are struggling with their financials.

New York’s neighbors are in the same position: New Jersey, Connecticut and Massachusetts have seen projects stalled or outright canceled, and a Rhode Island proposal was rejected as too expensive.

But all of the states have pressed forward — the southern New England states, New Jersey and now New York each have issued new solicitations in recent months.

Also, New York in late October announced conditional contract awards for three offshore wind projects totaling 4 GW of capacity.

The renewable energy industry had criticized the PSC for its decision and Hochul for an unrelated veto. But it welcomed the new solicitations.

Fred Zalcman, director of the New York Offshore Wind Alliance, said in a news release: “Actions speak louder than words, and we applaud the Hochul administration for providing, through this expedited RFP, a clear and unambiguous statement of support for offshore wind as an essential part of New York’s evolution towards a carbon-free grid.”

Anne Reynolds, executive director of the Alliance for Clean Energy New York, said: “I applaud New York’s fast action, because this sense of urgency is exactly what is needed to bring infrastructure projects to construction and achieve clean energy and climate goals.”

COP28: 118 Countries Pledge to Triple Renewables to 11,000 GW by 2030

In the face of a yawning gap in efforts to reduce global greenhouse gas emissions, 118 nations at the 28th United Nations Climate Change Conference of the Parties (COP28) in the United Arab Emirates pledged on Dec. 2 to triple renewable energy capacity and double energy efficiency savings by 2030.

COP28 President Sultan Ahmed al-Jaber announced the Global Renewables and Energy Efficiency Pledge, which will target expansion of global renewable capacity to 11,000 GW by 2030, while also raising the global annual rate for energy efficiency improvements from 2% to 4% per year.

The pledge states that “renewable deployment must be accompanied this decade by … a phasedown of unabated coal power, in particular ending the continued investment in unabated new coal-fired power plants, which is incompatible with efforts to limit warning to 1.5 degrees C.”

The pledge specifically commits nations to “put the principle of energy efficiency as the ‘first fuel’ at the core of policymaking, planning and major investment decisions.”

Countries signing onto the pledge are encouraged to adopt “ambitious national policies on renewable energy,” including accelerating permitting of renewable projects and infrastructure, expanding grid connections and improving energy system integration, and providing clarity on market design and investment frameworks for renewables.

“The world does not work without energy,” al-Jaber said in the COP28 press release on the pledge. “Yet the world will break down if we do not fix [the] energies we use today, mitigate their emissions at a gigaton scale and rapidly transition to zero-carbon alternatives.”

But European Commission President Ursula von der Leyen framed the pledge as a first step toward a fossil fuel phaseout. “With this global pledge, we have built a broad and strong coalition of countries committed to the clean energy transition ― big and small, north and south, heavy emitters, developing nations and small island states,” she said. “We are united by our common belief that to respect the 1.5 degrees C goal in the Paris Agreement, we need to phase out fossil fuels. We do that by fast-tracking the clean energy transition, by tripling renewables and doubling energy efficiency.”

The EU will invest $2.5 billion in the energy transition over the next two years, she said.

Lisa Jacobson, president of the Business Council for Sustainable Energy, hailed the pledge as “a milestone to be celebrated. It signals that the global community is united in its goal to advance the clean energy transition ― and is aware of the enormous level of deployment needed to do so quickly. To reach this goal, the business community has an essential role to play in directing investment and deploying technologies ― in all sectors and all geographies.”

Climate activists were more critical. While welcoming the renewables pledge, Janet Milongo, senior officer at the International Climate Action Network, said it “still falls short of what is required to achieve global climate goals. Prolongation of fossil fuel lifelines is evident. Dangerous distractions like carbon capture and storage have no place in an energy transition plan,” referring to the pledge’s mentions of “unabated coal power.”

The pledge was part of a series of announcements Dec. 2, made under an umbrella initiative, led by al-Jaber and the U.A.E., dubbed the Global Decarbonization Accelerator.

    • The U.A.E.’s Hydrogen Statement of Intent drew support from 27 countries, pledging to “endorse a global certification scheme and to recognize existing certification schemes … to unlock global trade in low-carbon hydrogen.”
    • Fifty companies, representing 40% of global oil production, have signed an Oil and Gas Decarbonization Charter, committing to zero methane emissions and the end of “routine” flaring by 2030 and total net-zero operations by 2050.
    • A Global Cooling Pledge will target a 68% cut in GHG emissions from refrigeration and space cooling technologies by 2050. Space cooling and refrigeration now account for 7% of global emissions but are expected to increase as more nations expand their use of air conditioning. According to the announcement, 52 nations have signed the pledge thus far.

A $1 billion effort to cut methane and other non-carbon greenhouse gas emissions will be announced Dec. 5. A key question now is whether the renewables pledge will be included in the final official agreement from the conference.

‘Urgency of the Moment’

With President Joe Biden deciding not to travel to the U.A.E., the U.S. presence at the COP28 initially was more muted than in the past, starting out with a widely criticized $17.5 million pledge to the new loss and damage fund approved on the first day of the conference.

The U.A.E. pledged $100 million and the EU pledged $245 million for the fund, which is intended to compensate developing countries for damages they already have sustained from extreme weather events made worse by climate change.

Speaking at the conference Dec. 2, Vice President Kamala Harris announced a $3 billion U.S. pledge to the Green Climate Fund, which helps developing countries invest in clean energy and resilience. As part of the Paris climate accords, industrialized countries including the U.S. pledged to raise $100 billion per year for the fund by 2030. The fund hit $89.6 billion in 2021, according to the Organization for Economic Cooperation and Development.

The U.S. also is launching an international Clean Energy Supply Chain initiative to expand and diversify the supply chains critical to the U.S. and global energy transition. Harris said the U.S. is going to provide $568 million for low-cost loans to expand clean energy manufacturing.

“The urgency of this moment is clear,” Harris said, according to a White House release. “We cannot afford to be incremental. We need transformative change and exponential impact. As nations, we must have the ambition that is necessary to meet this moment.”

The U.S. also joined more than 20 other nations in signing the Declaration to Triple Nuclear Energy by 2050, according to an announcement from the Department of Energy. The declaration commits signers to ensuring they operate nuclear facilities responsibly, with “the highest standards of safety, sustainability, security and non-proliferation, and that fuel waste is responsibly managed for the long term,” while mobilizing financing for new plants.

“We are not making the argument to anybody that [nuclear] is absolutely going to be the sweeping alternative to every other energy source — no, that’s not what brings us here,” said Special Presidential Envoy John Kerry, as reported in The New York Times. But, he said, “You can’t get to net-zero 2050 without some nuclear.”

The other major initiative from the U.S. on Dec. 2 was the release of the EPA’s final rule aimed at slashing the nation’s methane emissions 80% between 2024 and 2038..

Announced by EPA Administrator Michael Regan and White House National Climate Advisor Ali Zaidi, the new rule gives oil and gas companies two years to end routine flaring of natural gas from new oil wells and one year to phase in zero emissions standards for key equipment such as pumps and storage tanks. It requires close monitoring for leaks, while also opening the way for oil and gas companies to use new technologies, such as satellite monitoring and aerial surveys, to detect leaks.

The final rules were developed with feedback from nearly 1 million public comments EPA received on proposed regulations issued in 2021 and 2022, according to the agency announcement. Regan said the standards were developed “to advance American innovation and account for the industry’s leadership in accelerating methane technology.”

EPA also plans to enlist “third-party expertise” to find the large leaks, known as “super emitters,” which account for close to half of methane emissions from oil and gas.

Statements in the EPA announcement signaled broad support for the rule from industry and environmental groups.

Orlando Alvarez, chairman and president of bp America, said the final rule was “well designed” and would “help drive material methane emission reductions this decade and beyond.”

Fred Krupp, president of the Environmental Defense Fund, called the rule “a vital win for the climate and public health, dramatically reducing warming pollution and providing vital clean air protections to millions of Americans.”

COP28’s Two Narratives

The wave of new pledges and commitments comes as the conference faces the first Global Stocktake of how well the nations that signed the Paris Agreement in 2015 have lived up to their commitments to reduce their GHG emissions to limit climate change to 1.5 C.

The outlook is not encouraging. The UN’s Emissions Gap report, released prior to the conference, said even if all countries were to meet their commitments, the world still would be headed for 2.5 to 2.9 C of warming by the end of the century.

Adding to the sense of urgency, the World Meteorological Organization rolled out its provisional State of the Climate report on the opening day of the conference, confirming that 2023 has been the hottest year on record, with ongoing increases in GHG emissions, record sea level rise and record low Antarctic sea ice.

Even before the opening of COP28, two narratives had emerged about how the world should respond to the challenges ahead and what official actions the conference might endorse.

The dominant narrative, advanced by al-Jaber, the oil and gas industry and other oil-producing countries, is that, along with more renewables and energy efficiency, new technologies — like carbon capture and storage — can mitigate the worst effects of the ongoing combustion of fossil fuels.

The alternative narrative, advanced by a range of environmental groups and some nations, envisions a global commitment to a full, fair, fast and well-funded phaseout of all fossil fuels. At yet another event Dec. 2, Colombian President Gustavo Petro announced his country would be the 10th to join the call for a fossil fuel nonproliferation treaty.

The first calls for such a treaty came from Pacific Island nations in 2015, according to the initiative’s website, and supporters now include a range of cities and environmental and other nonprofits. Colombia is the second oil-producing country to support the treaty; the first was the Pacific Island nation of Timor-Leste.

Petro acknowledged the paradox of a fossil fuel-dependent country supporting nonproliferation but argued that preventing the “omnicide” of the planet itself must be avoided, as reported in the Guardian. “There is no other formula, no other path. Everything else is an illusion,” he said.

The critical question now is whether any of the pledges and commitments being rolled out in Dubai will find their way into the final conference agreement. Wide support for a fossil fuel phaseout is unlikely, and even official sanction for a phasedown may be difficult or significantly watered down, as has occurred in the past.

Al-Jaber once again fueled controversy Dec. 3 when the Guardian reported that during a pre-COP interview, he said there is “no science out there, or no scenario out there, that says that the phaseout of fossil fuel is what’s going to achieve 1.5 C.”

Responding to those comments, Kerry pivoted the argument, saying the focus for limiting climate change to 1.5 C must be on “a phasing out of unmitigated fossil fuel emissions,” as reported by CNBC.

At a press conference on Dec. 4, al-Jaber said his comments were misrepresented and taken out of context, according to the Guardian.

“I respect science in everything I do,” he said. “I have said over and over the phasedown and the phaseout of fossil fuel is inevitable. In fact, it is essential.”