Search
`
August 8, 2024

Transmission Planning

© RTO Insider LLC
MISO Members Approach Revised NIETCs with Hope, Caution
MISO members were hopeful over the Department of Energy’s plan to designate National Interest Electric Transmission Corridors to expedite expansion.
The White House
The IRA at 1: Implementing at Speed and Scale Remains Key Challenge
One year on, implementation of the IRA has not been smooth or easy, and four out of 10 registered voters say they know nothing about the law.
PJM
PJM PC/TEAC Briefs: Aug. 8, 2023
PJM stakeholders approved a load model for the 2023 reserve requirement study during the Planning Committee's Aug. 8 meeting.
© RTO Insider LLC
Overheard at MARC 2023: Equity and the Energy Transition
The annual MidAmerica Regulatory Conference concentrated on how to deliver the clean energy conversion equitably.
© RTO Insider LLC
MARC 2023 Touches on Order 2023, Interconnection Troubles
This year’s Mid-America Regulatory Conference took notice of FERC’s recent set of interconnection rule changes.
© RTO Insider LLC
What are National Interest Electric Transmission Corridors and Why Do We Need Them?
A primer on DOE's proposal for creating National Interest Electric Transmission Corridors.
Department of Energy Draft Needs Study
States, RTOs Caution DOE on Transmission Corridors
States, RTOs and others warned DOE not to let transmission developers dominate the development of National Interest Electric Transmission Corridors.
NYISO
FERC Sets Niagara Mohawk Transmission Rate for Hearings
FERC set Niagara Mohawk's proposal to recover its small share of a larger public policy for hearings, as it was unable to determine whether the rate was just and reasonable.
National Grid Renewables
Renewable Developers Challenge MISO’s Lower Congestion Limit
A group of renewable developers lodged a complaint at FERC over MISO’s pursuit of a smaller system impact threshold on interconnecting generation.
© RTO Insider LLC
FERC OKs CAISO Interconnection Study Deadline Changes
FERC accepted CAISO's proposed tariff revisions following record-breaking numbers of interconnection requests in 2021 and 2023.

Want more? Advanced Search