Generation
CoalGeothermalHydrogenHydropowerNatural GasNuclear PowerOffshore WindOnshore WindOperating ReservesRooftop/distributed SolarUtility-scale Solar
FERC approved a transmission asset swap between Idaho Power and PacificCorp as part of the companies’ plans to develop a 300-mile-long, 500-kV line.
FERC is moving to grant a solar developer’s request to force the Arizona Electric Power Cooperative to allow interconnection.
Market monitors from all six FERC-jurisdictional ISO/RTOs endorsed calls for a NERC-like gas reliability organization.
Staff from the Illinois Commerce Commission put their own spin on an analysis showing how much Ameren’s switch to PJM could cost MISO.
Transmission upgrades that are needed to avoid overloads in a fully electrified New England by 2050 could cumulatively cost between $22 billion and $26 billion, ISO-NE told its Planning Advisory Committee.
FERC issued an order extending the time it has to review the proposed purchase of Energy Harbor by Vistra to next spring after several parties raised market concerns over the deal between two existing PJM generation owners.
NYISO did not identify any new near-term reliability issues in its third-quarter STAR, but it does anticipate significant load increases in western and central New York that could warrant more attention.
The Ninth Circuit rejected a challenge to the Bonneville Power Administration's decision to lower rates from conservation groups, who argued more funding should have been directed to fish and wildlife protection.
NYISO gave summer and monthly operation updates during the OC meeting, and stakeholders recommended the approval of the draft annual Comprehensive Reliability Plan.
CAISO maintained normal grid operations during the Oct. 14 solar eclipse, with swings in solar production that were more muted than models based on clear-sky conditions.
Want more? Advanced Search