Search
`
November 19, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
​MISO, SPP Commit to Replacing Affected System Studies
An illustrative example of the JTIQ affected system zone divided by MISO Midwest and MISO South
An illustrative example of the JTIQ affected system zone divided by MISO Midwest and MISO South | SPP and MISO
MISO, SPP revealed details of their plan to abandon the maligned affected system study process in favor of regular interregional transmission planning studies.
MISOSPP/WEISTransmission Planning