Search
December 22, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
FERC OKs MISO’s Bifurcated Cost-allocation Tx Design
© RTO Insider LLC
FERC has allowed MISO to use a separate-but-equal postage stamp rate divided between MISO Midwest and MISO South for some of its major transmission buildout.
FERC & FederalMISOPublic PolicyTransmission PlanningTransmission Rates