Search
December 22, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
NY Offshore Wind Transmission Project Draws No Residential Comment
The EW1 submarine export cables will extend from the shoreline either directly to the cable terminations or to a vault within the onshore substation.
The EW1 submarine export cables will extend from the shoreline either directly to the cable terminations or to a vault within the onshore substation. | Empire Wind
The first offshore transmission project in New York will run from Empire Wind 1 right under Brooklyn streets — and drew no comment from local residents.
New YorkNYISOOffshore WindOffshore Wind PowerPublic Service CommissionState and Local PolicyTransmission & DistributionTransmission Planning