Search
December 23, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
2050 Tx Study Finds Thousands of Miles of Overloads in ISO-NE
Half of the transmission lines in New England could be overloaded by 2050, according to the preliminary results of a new ISO-NE study.
Half of the transmission lines in New England could be overloaded by 2050, according to the preliminary results of a new ISO-NE study. | ISO-NE
The preliminary results of ISO-NE’s 2050 Transmission Study suggests that New England will need to build new transmission and shift existing resources.
ISO-NE Planning Advisory CommitteeTransmission Planning