PJM MRC/MC Briefs: Aug. 21, 2024
PJM presented the factors leading to an increase in capacity costs in the 2025/26 Base Residual Auction. | PJM
Aug 26, 2024
|
Consumers and electric distributors in PJM opposed a proposal to revise two financial parameters used to calculate the cost of new entry input to the 2027/28 Base Residual Auction.