Search
`
November 24, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
GE Vernova Finds Defect in Vineyard Wind Blade
Company Says It is Addressing Problems with Money-losing Wind Power Segment
A GE Vernova wind turbine with LM Wind Power blades is shown in late 2023 at the Dogger Bank Wind Farm under construction off the English coast.
A GE Vernova wind turbine with LM Wind Power blades is shown in late 2023 at the Dogger Bank Wind Farm under construction off the English coast. | LM Wind Power
|
The defect is believed to be isolated but the other hundred-plus blades made at the same factory will be inspected to be sure.
Company NewsNatural GasOffshore Wind PowerOnshore Wind Power