Search
`
June 30, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
ERCOT Technical Advisory Committee Briefs: May 22, 2024
ERCOT's Matt Mereness briefs TAC on the real-time co-optimization plus battery project.
ERCOT's Matt Mereness briefs TAC on the real-time co-optimization plus battery project. | © RTO Insider LLC
|
ERCOT stakeholders plumbed the depths of Robert’s Rules of Order and amended motions before endorsing a rule change that allows the grid operator to manually release contingency reserve service from economically dispatched resources after repeated violations of the system power balance constraint. 
Ancillary ServicesEnergy MarketERCOT Technical Advisory Committee (TAC)ReservesTransmission OperationsTransmission Planning