Search
`
July 3, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
PJM Awaiting FERC Response to Court Rejection of 2024/25 Capacity Auction Parameters
Craig Glazer, PJM
Craig Glazer, PJM | © RTO Insider LLC
|
PJM updated stakeholders on how it will proceed in the wake of a 3rd Circuit ruling vacating a FERC order allowing the RTO to revise a parameter after bids had been received for the 2024/25 Base Residual Auction.
Capacity MarketPJM Markets and Reliability Committee (MRC)