Search
`
November 21, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
CAISO Seeks FERC’s OK to Shut 2024 Interconnection Window
CAISO has seen a sharp increase in interconnection requests over its past two study periods, with cluster 15 representing over 350 GW of new capacity.
CAISO has seen a sharp increase in interconnection requests over its past two study periods, with cluster 15 representing over 350 GW of new capacity. | CAISO
|
CAISO wants to stop taking new interconnection applications this year as it works through the “unprecedented volume” of requests submitted for the previous study period.
CAISO/WEIMGenerationTransmission Planning