Hickenlooper and Peters Introduce BIG WIRES Act
Requires FERC to set Minimum Interregional Transfer Requirements, but not for Texas
Sep 17, 2023
|
The BIG WIRES Act would require FERC to set minimum transfer capabilities between regions to better connect the grid in order to promote reliability and ship cheap power around the country.