Search
`
July 5, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
Planners Near Artificial Island Pick
LS Power Still Low-Cost Option
PJM is close to naming a developer to fix the Artificial Island transmission stability problem, with LS Power’s proposal for an overhead crossing of the Delaware River holding on as the lowest-cost choice.
PJM Transmission Expansion Advisory Committee (TEAC)Transmission Planning