Search
`
November 22, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
Impatient FERC Hints at Action on PJM-MISO Seams Disputes
FERC increased its pressure on PJM and MISO to resolve their longstanding boundary disputes, saying it was considering taking action “to improve the efficiency of operations” at the RTOs’ seam.
FERC & FederalGenerationTransmission OperationsTransmission Planning