Search
`
November 22, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
SPP Briefs
Working Groups Vote to Pull SPS Project
The SPP Transmission and Economic Studies working groups met jointly April 3 to vote on staff’s re-evaluation of the 90-mile Potter-Tolk transmission line.
GenerationOther SPP CommitteesSPP/WEISTransmission OperationsTransmission Planning