Search
`
November 22, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
Nev. Regulators OK Controversial Gas-fired Peaker
NV Energy's new gas-fired peaker facility will be built at the site of the Silverhawk Generating Station in Southern Nevada.
NV Energy's new gas-fired peaker facility will be built at the site of the Silverhawk Generating Station in Southern Nevada. | Lochsa Engineering
State regulators approved NV Energy’s controversial plan to build a 400-MW gas-fired peaker in Southern Nevada that the utility says is needed for reliability.
Natural GasNevadaWestern Energy Imbalance Market (WEIM)