PJM PC/TEAC Briefs: March 8, 2018
Transformer Consideration Changed for Gen Deliverability
Mar 13, 2018
American Electric Power’s portion of Duff-Rockport-Coleman project has been placed on hold and will not be modeled in the 2018 RTEP, PJM told the TEAC.