Search
`
November 22, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
FERC Approves SPP’s PMU Installations
FERC accepted SPP’s proposed Tariff revision requiring the installation of phasor measurement units at new generator interconnections.
SPP/WEISTransmission Operations