Search
December 19, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
Maine Environmental Regulator Considering Suspension of NECEC Permit
The New England Clean Energy Connect transmission line is planned to interconnect with an existing line near the Androscoggin River seen here in Lewiston, Maine.
The New England Clean Energy Connect transmission line is planned to interconnect with an existing line near the Androscoggin River seen here in Lewiston, Maine. | Shutterstock
|
Maine DEP Commissioner Melanie Loyzim is opening a proceeding to consider suspending the permit granted for the NECEC project.
ISO-NEMaineTransmission Planning