Search
`
November 23, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
Tx Fault Could Trip Thousands of MWs of DERs, ISO-NE Study Says
A new transmission study from ISO New England lays out the challenges of incorporating DERs into the grid.
A new transmission study from ISO New England lays out the challenges of incorporating DERs into the grid. | © RTO Insider LLC
An ISO-NE study warned that DERs with older inverters that don't allow them to ride through faults could trip during high solar output and low demand.
Distributed Energy Resources (DER)ISO-NENPCCReliabilityTransmission Operations