Search
`
October 4, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
Long Road Still Ahead for Aroostook Transmission Project
Annual average wind speed at 100 meters above surface level
Annual average wind speed at 100 meters above surface level | NREL
|
A proposed transmission project to relieve transmission constraints in Maine has received a major boost with the U.S. Department of Energy’s announcement of an up-to $425 million investment in the project, but challenges still remain.
Department of EnergyISO-NEMaineMaineOnshore WindOnshore Wind PowerTransmission & DistributionTransmission Planning