Search
`
November 21, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
FERC Rules for CAISO on Capacity Deliverability Rights Complaint
Complainant Argued ISO Unlawfully Ended Rights for Gas-fired Plant in Mexico
Saavi is an independent power producer with generating plants across Mexico.
Saavi is an independent power producer with generating plants across Mexico. | Saavi Energía
|
FERC denied a complaint by energy conglomerate Saavi alleging CAISO unlawfully terminated the full capacity deliverability rights for its gas-fired generating unit in Mexico that previously was interconnected with the ISO’s grid.
Battery Electric StorageCAISO/WEIMNatural GasTransmission Operations