Search
`
November 21, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
Mass. AGO, DOER Call for Climate Guardrails on Everett LNG Contracts
The Mystic Generating Station in Everett, MA.
The Mystic Generating Station in Everett, MA. | Shutterstock
|
The Massachusetts AGO and DOER expressed concern about the climate effects of proposed utility supply contracts to keep the Everett LNG import facility operating until 2030. 
MassachusettsNatural Gas