Search
`
July 3, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
MISO Says Overloads and Congestion Loom Without 2nd Long-range Tx Portfolio
MISO Executive Director of Transmission Planning Laura Rauch
MISO Executive Director of Transmission Planning Laura Rauch | © RTO Insider LLC
|
After completing its initial economic and reliability analysis, MISO has found numerous overloads and congestion await its system if it doesn’t recommend a second long-range transmission plan portfolio.
MISO Planning Advisory Committee (PAC)Transmission Planning