Search
December 24, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
DOE to Sign up as Off-taker for 3 Transmission Projects
Tx Needs Study: US Should Increase Interregional Lines Fivefold by 2035
The final National Transmission Needs Study finds that interregional transmission will have the highest value between ERCOT and non-ISO regions in the Mountain West and Southwest.
The final National Transmission Needs Study finds that interregional transmission will have the highest value between ERCOT and non-ISO regions in the Mountain West and Southwest. | DOE
|
The Department of Energy will put $1.3 billion into becoming the anchor off-taker for three interstate transmission projects totaling 3.5 GW of new transmission capacity.
Department of EnergyTransmission PlanningWhite House