Search
March 26, 2025
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
Stakeholder Soapbox: Transmission Keeps the Lights On
Existing electricity transmission transfer capacity between adjacent FERC Order 1000 planning regions. Percent reflects the interconnection capacity of connected regions as a percentage of the peak load of the larger region.
Existing electricity transmission transfer capacity between adjacent FERC Order 1000 planning regions. Percent reflects the interconnection capacity of connected regions as a percentage of the peak load of the larger region. | Niskanen Center
FERC must act to strengthen interregional transmission ties to improve reliability, says former Arkansas PSC Chair Ted Thomas.
Please enter your email address (business domain required) for access.
CommentaryFERC & FederalTransmission Planning