Search
April 15, 2025
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
CAISO Proposes Interconnection Queue Process Overhaul
Studying Hundreds of Projects in Queue ‘Just Doesn’t Work,’ CEO Says
CAISO says the number of interconnection requests (blue line) and requested capacity (red bars) has accelerated dramatically, while the percentage of projects moving into the second phase of interconnection studies (orange bars) has been higher than normal.
CAISO says the number of interconnection requests (blue line) and requested capacity (red bars) has accelerated dramatically, while the percentage of projects moving into the second phase of interconnection studies (orange bars) has been higher than normal. | CAISO
|
A new CAISO stakeholder initiative aims to overhaul its interconnection process to deal with a flood of requests to connect renewable resources and storage.
Please enter your email address (business domain required) for access.
CAISO/WEIMCaliforniaGenerationTransmission Planning