Search
December 22, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
PJM PC/TEAC Briefs: May 10, 2022
Thermal violation identified with a solution on the Beaver-Hayes 345 kV line in Ohio.
Thermal violation identified with a solution on the Beaver-Hayes 345 kV line in Ohio. | PJM
PJM delayed a vote on the draft charter of the Interconnection Process Subcommittee at last week’s Planning Committee meeting.
PJM Planning Committee (PC)PJM Transmission Expansion Advisory Committee (TEAC)Transmission Planning