Search
December 26, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
NREL: US Will Need 2,100 American-made OSW Turbines by 2030
Report Finds Only 1 U.S. Port Currently Capable of Supporting Offshore Construction
Annual and cumulative installed capacity for existing and anticipated lease areas
Annual and cumulative installed capacity for existing and anticipated lease areas | NREL
|
Reaching the goal of constructing 30 GW of offshore wind by 2030 will require a supply chain capable of producing more than 2,100 wind turbines, a report says.
Offshore WindOffshore Wind Power