2050 Tx Study Finds Thousands of Miles of Overloads in ISO-NE
Half of the transmission lines in New England could be overloaded by 2050, according to the preliminary results of a new ISO-NE study. | ISO-NE
Mar 17, 2022
The preliminary results of ISO-NE’s 2050 Transmission Study suggests that New England will need to build new transmission and shift existing resources.