Search
March 13, 2025
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
DC Circuit Shoots down NE Utilities on CIP Cost Recovery Cutoff Date
Cross-Sound Cable Co., which operates a 24-mile submarine cable under Long Island Sound to connect the New England and Long Island electric grids, is a merchant transmission facility that ISO-NE has designated as IROL-critical. The 330-MW HVDC line terminates on Long Island at the Shoreham converter station (pictured).
Cross-Sound Cable Co., which operates a 24-mile submarine cable under Long Island Sound to connect the New England and Long Island electric grids, is a merchant transmission facility that ISO-NE has designated as IROL-critical. The 330-MW HVDC line terminates on Long Island at the Shoreham converter station (pictured). | Cross-Sound Cable Co.
|
Utilities cannot recover prior costs of complying with NERC's critical infrastructure protection standards in ISO-NE, the D.C. Circuit Court said.
Please enter your email address (business domain required) for access.
CIPFERC & FederalISO-NENERC & CommitteesNPCCReliabilityTransmission Operations