Tx Fault Could Trip Thousands of MWs of DERs, ISO-NE Study Says
A new transmission study from ISO New England lays out the challenges of incorporating DERs into the grid. | © RTO Insider LLC
Jan 18, 2022
An ISO-NE study warned that DERs with older inverters that don't allow them to ride through faults could trip during high solar output and low demand.