Search
December 22, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
Washington Pumped Hydro Project Faces Permitting, Obstacles
The proposed pumped hydro project would use a lower and upper reservoir above the John Day Dam on the Columbia River.
The proposed pumped hydro project would use a lower and upper reservoir above the John Day Dam on the Columbia River. | Washington Dept. of Ecology
|
Washington’s first pumped storage generator is expected to go online between 2028 and 2030, if it can obtain the needed state and federal approvals.
CAISO/WEIMEnergy StorageHydropowerRenewable PowerState and Local PolicyTransmission & DistributionWashington