Search
December 22, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
PJM Stakeholders Blast TOs’ Petition to Rate-base Network Upgrades
Interconnection Queue Volume (as of Oct. 20, 2020)
Interconnection Queue Volume (as of Oct. 20, 2020) | PJM
|
Protesters urged FERC to reject a bid by PJM transmission owners to fund network upgrades and add them to their rate bases.
PJMTransmission Rates