Search
December 22, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
FERC Goes Back to the Drawing Board on Transmission Planning, Cost Allocation
National Renewable Energy Laboratory
|
FERC voted to reconsider its rules on transmission planning, cost allocation and generator interconnection, acknowledging the failures of  Order 1000.
Transmission Planning