Search
December 23, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
Lubbock Load Could Boost ERCOT Production Costs by $66M
ERCOT said its analysis of Lubbock Power & Light’s integration into the Texas grid reveals as much as a $66 million increase in production costs.
Company NewsERCOT Technical Advisory Committee (TAC)Transmission Planning