Search
`
November 21, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
PJM PC/TEAC Briefs: April 11, 2019
Manual Changes Move Ahead Without ELCC, for now
PJM’s Planning Committee endorsed capacity generation rule changes for Manual 21, save the controversial effective load-carrying capability calculations.
GenerationPJM Planning Committee (PC)PJM Transmission Expansion Advisory Committee (TEAC)Transmission OperationsTransmission Planning