Search
December 23, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
SMUD Cancels 500-kV Tx Line Project
SMUD said it is canceling a 500-kV transmission line project it was developing with WAPA because it had proven too expensive and was no longer needed.
CAISO/WEIMTransmission Planning