Search
April 26, 2025
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
PUCT Urges 2nd Look at Freeport Project Costs
|
The PUCT signaled its discomfort with the rising costs of CenterPoint Energy’s planned 345-kV transmission line to serve load in the Freeport area.
Please enter your email address (business domain required) for access.
Public Utility Commission of Texas (PUCT)TexasTransmission Planning