Search
December 24, 2024
Looking to read the full article? Scroll down and login or sign up today!
Page Reload Scroll Position
NERC: ERCOT, CAISO Face Summer Reliability Concerns
NERC said Wednesday that its annual summer reliability assessment indicates ERCOT and CAISO will face operational challenges and potential reliability concerns this summer, thanks to the two ISOs’ respective loss of baseload generation and lack of fuel assurance.
CAISO/WEIMERCOTISO-NEMISONYISOPJMResource AdequacySPP/WEISTransmission Operations